Organisation Chain |
CE (Electrical) Hydro
Electric Projects Mumbai||SE Ghatghar (E and M) Circle Kalwa Thane||EE
Ghatghar Hydro Electric Div No.3 Kalwa-Thane |
Tender Reference Number |
No. EE/GHEDU-3/ 06 OF 2018-19 |
Tender ID |
2018_MHEPM_361580_1 |
Tender Type |
Open Tender |
Form Of Contract |
Percentage-Rate |
Tender Category |
Services |
No. of Covers |
2 |
General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
Payment Mode |
Online |
Is Multi Currency Allowed For BOQ |
No |
Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
|
1 |
Fee/PreQual/Technical |
1 Registration with PWD as electrical contractor AND Valid license from IE L Department of Governme |
.pdf |
|
|
2 Tender Forwarding Letter AND Undertaking by the Contractor |
.pdf |
|
|
3 Declaration of the Contractor AND Power of Attorney |
.pdf |
|
|
4 Work of similar type and magnitude Technical Personnel AND Plant and Machinery |
.pdf |
|
|
5 Certificate of Enrollment of PT and PT (E) PT(R) |
.pdf |
|
|
6 VAT GST Registration Certificate AND Registration certificate of Labour Provident Fund |
.pdf |
|
|
7 PAN card or attested copy of Income Tax Return |
.pdf |
2 |
Finance |
Offer in the appropriate place in BOQ form |
.xls |
|
|
Copy of Tender Document |
.pdf |
|
|
Scan copy of Demand Draft towards Additional Performance Security |
.pdf |
|
|
|
|
|
|
|
|
Tender Fee in ₹ |
2,240 |
Fee Payable To |
via Payment Gateway |
Fee Payable At |
Online |
Tender Fee Exemption Allowed |
No |
|
|
EMD Amount in ₹ |
17,700 |
EMD Exemption Allowed |
No |
EMD Fee Type |
fixed |
EMD Percentage |
NA |
EMD Payable To |
via Payment Gateway |
EMD Payable At |
Online |
|
|
|
|
|
|
Title |
Installation of Fire
alarm control panel Capacitor bank replacement of incoming cable and
supplying installing Cassatte AC to the renovated office building of
Chief Engineer Electrical Hydro project at Honkong shanghai Bank
Building 4th floor F |
Work Description |
Installation of Fire
alarm control panel Capacitor bank replacement of incoming cable and
supplying installing Cassatte AC to the renovated office building of
Chief Engineer Electrical Hydro project at Honkong shanghai Bank
Building 4th floor F |
Pre Qualification |
Please refer Tender documents. |
Independent External Monitor |
NA |
Tender Value in ₹ |
17,61,208 |
Product Category |
Supply/Erection/Commissioning |
Sub category |
NA |
Contract Type |
Tender |
Bid Validity(Days) |
120 |
Period Of Work(Days) |
90 |
Location |
Fort Mumbai |
Pincode |
400001 |
Pre Bid Meeting Place |
NA |
Pre Bid Meeting Address |
NA |
Pre Bid Meeting Date |
NA |
Bid Opening Place |
Office of the Executive Engineer Ghatghar HydroEle |
Should Allow NDA Tender |
No |
Prequalification Approval Date |
NA |
Allow Preferential Bidder |
No |
|
|
Published Date |
15-Oct-2018 03:00 PM |
Bid Opening Date |
02-Nov-2018 11:30 AM |
Document Download / Sale Start Date |
15-Oct-2018 03:00 PM |
Document Download / Sale End Date |
30-Oct-2018 06:00 PM |
Clarification Start Date |
NA |
Clarification End Date |
NA |
Bid Submission Start Date |
15-Oct-2018 03:00 PM |
Bid Submission End Date |
30-Oct-2018 06:00 PM |
|
|
NIT Document |
1 |
Tendernotice_1.pdf |
Detailed tender notice for the work of
Installation of Fire alarm control panel Capacitor bank replacement of
incoming cable and supplying installing Cassatte AC to the renovated
office building of Chief Engineer Electrical Hydro project at Honkong
s
|
96.05
|
2 |
Tendernotice_2.pdf |
Bid Document for the work of Installation of Fire
alarm control panel Capacitor bank replacement of incoming cable and
supplying installing Cassatte AC to the renovated office building of
Chief Engineer Electrical Hydro project at Honkong shanghai Ba
|
2312.96
|
|
|
Download as zip file
|
Work Item Documents |
1 |
Tender Documents |
ceacbiddoq2018.pdf
| bid document for the work
ofInstallation of Fire alarm control panel Capacitor bank replacement of
incoming cable and supplying installing Cassatte AC to the renovated
office building of Chief Engineer Electrical Hydro project at Honkong
shanghai Ban |
2299.23 |
2 |
BOQ |
BOQ_618297.xls
| BOQ for the work of
Installation of Fire alarm control panel Capacitor bank replacement of
incoming cable and supplying installing Cassatte AC to the renovated
office building of Chief Engineer Electrical Hydro project at Honkong
shanghai Bank Buildi |
284.00 |
|
|
|
|
Name |
Executive Engineer |
Address |
Office of Executive Engineer Ghatghar Hydro Electric Divisional Unit No 3 |
|
https://mahatenders.gov.in/nicgep/app?component=%24DirectLink_0&page=FrontEndAdvancedSearchResult&service=direct&session=T&sp=SWqTTfwE24WWuxRBdxLrJ3w%3D%3D